Grand Central's Respect for History Is From The Ground Up and you can own a piece of it.

From 2007-2012, the MTA worked to restore the marble floor of Grand Central Terminal. In order to perfectly match the new tile to the existing slabs, the Transit Authority persuaded the quarry of the original Tennessee pink marble to reopen for this project after it had been closed for nearly 30 years. The marble used for this jewelry is from the slabs that were replaced.

These cuff links are crafted from the surface of the authentic Tennessee pink marble from the Main Concourse floor of Grand Central Terminal (GCT). Set in a 4-prong sterling silver setting with a swivel finding, each marble piece features the slight wear of commuter and sightseer traffic. Measures 3/4" x 7/16".

Officially licensed by the New York Transit Authority, each pair of cuff links come in a GCT gift box with a Certificate of Authenticity.

 

Read the article Grand Central's Respect for History Is From The Ground Up to learn more about the restoration.

 

In stock

SKU 1-2642

Description / Grand Central Terminal Marble Cuff Links

Grand Central's Respect for History Is From The Ground Up and you can own a piece of it.

From 2007-2012, the MTA worked to restore the marble floor of Grand Central Terminal. In order to perfectly match the new tile to the existing slabs, the Transit Authority persuaded the quarry of the original Tennessee pink marble to reopen for this project after it had been closed for nearly 30 years. The marble used for this jewelry is from the slabs that were replaced.

These cuff links are crafted from the surface of the authentic Tennessee pink marble from the Main Concourse floor of Grand Central Terminal (GCT). Set in a 4-prong sterling silver setting with a swivel finding, each marble piece features the slight wear of commuter and sightseer traffic. Measures 3/4" x 7/16".

Officially licensed by the New York Transit Authority, each pair of cuff links come in a GCT gift box with a Certificate of Authenticity.

 

Read the article Grand Central's Respect for History Is From The Ground Up to learn more about the restoration.

 

What's The Story

From 2007-2012, the MTA restored the marble floor of Grand Central Terminal. In order to perfectly match new stone to the existing slabs, the MTA persuaded the quarry of the original Tennessee pink marble to reopen for this project after it had been closed for nearly 30 years. The marble used for this item is from slabs that were replaced.

We found other products you might like!

Navigating through the elements of the carousel is possible using the tab key. You can skip the carousel or go straight to carousel navigation using the skip links.
Kids Tee N Train (Brooklyn to Queens)
As low as $21.00
2012 Grand Central Catwalk - MTA Arts & Design Art Card
$25.00
2011 The Subway Soirée - MTA Arts & Design Art Card
$25.00
NYC Subway #C Train Teddy Bear
$10.95
6 Inch Curved Wooden Track
$2.25
Long Island Rail Road In Color Volume 2: 1966 – 1990 Book
$59.95
Black Vignelli Manhattan Magnet
$4.00
3 Train Magnet
$3.00
New York Wonder City Tote Bag
$21.00
Locomotive Wooden Kit-Set
$16.95
Frequently bought together
Magnet WTC Cortland St
$5.95
MTA Long Island Rail Road 2-Car Set
$32.95
Adult W Train Baseball Hat
$28.00
Kiki Smith Light of the World Scarf
$350.00
NYC Subway Token Gold-Plated Cufflinks
$135.00
NYC Subway Kids "All-Over" Map Tee
As low as $24.00
Adult 1 Train Baseball Hat
$28.00
NYC Subway Diagram Map Adult Bucket Hat
$44.00